Adding Drains to the Floodplain to Keep Motorists Safe

At the March 2016 project open house, many local folks voiced concerns about the volume of water that sometimes saturates the area. When we tested different high water scenarios, using a hydraulic model, we recognized that the new section of road would actually need 11 large flood relief culverts, and the bridge would have to be five metres longer to accommodate the Tsolum River when things got extra wet.