Posts Tagged ‘ bridge building ’

Why Pile Driving is a Powerful First Step for Massey Bridge

If you’ve driven north on Highway 99 towards the George Massey Tunnel lately, you may have noticed a crane working on Deas Island. Crews were collecting geotechnical data as part of the George Massey Tunnel Replacement Project. The crane was equipped with a large pile driver, which pounded five piles into the ground to determine the maximum load a single pile can hold in that particular soil. The information will be provided to designers bidding on the contract to...

Read more »