Posts Tagged ‘ massey bridge ’

Why Pile Driving is a Powerful First Step for Massey Bridge

If you’ve driven north on Highway 99 towards the George Massey Tunnel lately, you may have noticed a crane working on Deas Island. Crews were collecting geotechnical data as part of the George Massey Tunnel Replacement Project. The crane was equipped with a large pile driver, which pounded five piles into the ground to determine the maximum load a single pile can hold in that particular soil. The information will be provided to designers bidding on the contract to...

Read more »

The Answers to Massey Bridge Questions

Fraser River Bridge

Today we kicked off the third phase of consultation on the George Massey Tunnel Replacement Project and released some designs and details of the big project, which will see a new 10-lane bridge built over the Fraser River at Highway 99. And it will be a BIG project. Here’s the breakdown: The bridge will be approximately three kilometres long, with four general travel lanes in each direction One dedicated transit/HOV lane in each direction of Highway 99, from Highway...

Read more »