Tell TranBC

Tell TranBCWhat Do You Want to Know More About?

Are you looking for something on TranBC but can’t find it?

Or have a question about what the ministry does and why we do it?

Share your question with us and we’ll try to get you an answer.

Who knows – your question could be our next blog!

Thank you – we couldn’t do this without YOU.

1,751 comments on “Tell TranBC”

Leave a Reply to Andrew Smith Cancel reply

  1. I want to express my gratitude for the recent highway cam additions on Highway 1 at Millstream Rd and Goldstream. These new views are extremely helpful. Thank you so much!

    Reply
  2. I live in Eagle Bay in the Shuswap. I’m in my 70’s, have a heart condition and I am a widow. This is the second complaint letter I have written in my life. The first was also to you and about the same issue. My driveway was filled with snow from both banks by the grader this morning, narrowing the entrance so badly that only a narrow vehicle can get through. I have a pile ice 4’ tall and 8’ wide on each side of my driveway. If this problem continues I will have to contact my lawyer and my brother who is a Supreme Court judge.

    Reply
    • Good morning Kristina,

      Thanks for your comment. We understand that our area manager has been in contact with you directly regarding your concern. If you continue to have questions or concerns about maintenance, or anything else in your area, let us know!

      Reply
  3. I have a concern with the construction zone speed limit on Highway 1 at the McKenzie Interchange project. Currently it is 60 km/h as it has been for last several years during construction. The 60 km/h was reasonable when the alignment was adjusted to the temporary ramps for the last year but now that the alignment has been shifted to the new permanent alignment and traffic is free-flowing I find that 60 km/h is unnecessarily restrictive. Traffic is usually flowing 70-80 km/h during non-peak periods and the few people who choose to drive 60 km/h often get tailgated which creates a less safe driving environment for everyone else. Also the restrictive nature of the speed zone can create antagonism toward police as it would be seen as an easy speed trap due to the few motorists who drive 60 km/h. I am hoping that the construction speed zone can be re-evaluated to determine if a increase is warranted. Thank you.

    Reply
    • Hi again Colton,

      While we are all excited that the highway is open and we are starting to see how the project will look once finished, it is still an extremely active construction site with workers and equipment near the roadside. Workers may be in different areas at any time, and normal safety features such as lighting and barriers may not be in final position. For that reason, the speed limit is a lower 60km/h to keep everyone safe.

      Reply
      • I also want to mention a safety hazard with the lane markings when heading southbound between the southbound on-ramp from McKenzie Ave/Admirals Rd to the Burnside Rd off-ramp. There are sections where the lane markings have completely disappeared which can be quite dangerous when there’s poor visibility due to weather or night time. Also when heading northbound on the highway just past the on-ramp from McKenzie Ave there is a section with no lane markings.

        Reply
        • Thanks for this info Colton, we will share this back with the project manager, but a reinforcement for the lowered speed limits in place in construction sites as the road markings can be in a state of flux and extra caution and reduced speed help navigate those uncertain spots.

          Reply
          • Thanks for sending my concern to the project manager. I don’t want to make it sound like I don’t support construction speed zones. Obviously lower speeds are necessary in most construction zones but I was more referring to what the right construction speed limit is. Perhaps 70 km/h would better meet drivers expectations. Even in the Traffic Management Manual for Work on Roadways it states “Speed zone speed limit too slow: Driver disrespect of the construction speed limit leads to heavy queuing, improper passing or tailgating. The construction speed limit should always reflect the actions of a reasonable driver. A reasonable speed limit builds respect for all traffic control, improving overall safety through the work zone” (Section 2.4.6). Since the construction speed limit is to be retained at 60 km/h I think a 70 km/h transition zone or additional speed warning signs when heading southbound on Highway 1 before the 60 km/h zone would be helpful in better managing driving speeds as the current significant drop to 60 km/h from 90 km/h leads to aggressive braking from some drivers who are caught off guard by the significant decrease in speed.

  4. Hi there. I just noticed that the ministry had a hot-in-place resurfacing project for Vancouver Island Highways 1, 14, and 19 up for tender (Project No. 16867-2020). I was pleased to see this as the road surface particularly on Highway 1 near Colwood is quite bumpy with all of the patch work over the years. I am just curious if the ministry has a timeline for when construction is expected to start? Thank you.

    Reply
    • Good morning Colton – thanks for your message. These projects have a rough estimated date of start in the month May but this date is subject to the award timeline, weather timelines, etc. Sorry we couldn’t be more specific.

      Reply
  5. Hello. I am currently licensed as a Class 2 School Bus Driver Improvement Instructor,
    (S Endorsement), in Alberta.
    I am moving home to B.C. this year, and would like to know if I will retain this qualification to instruct in B.C., or if I would have to be re-certified to be an instructor for British Columbia. And if I should be asking a different department, would you kindly re-direct me?
    Thank you.

    Reply
  6. Well far from retrieving the comments you lost from ‘Tell TranBC’ you have now lost everything before Feb 16th! There might be 1730 comments but the public can only see 2 of them!

    Reply
  7. I have an issue with the Shaughnessy and highway 7A intersection in Port Coquitlam. It backs up every day in both ways of my commute and also the entrance from Shaughnessy to 7A west has no merging lane. So it’s flat out dangerous to merge with traffic flowing at 80-90kmh. Even when there is a big gap in the right lane of West heading traffic I have merged and had someone in the left lane (in their attempt to pass on the right) almost drive in to me when they attempted to change lanes. There is no solid line between lanes like there should be to protect drivers from merging cars.

    On top of that the highway 7a east left turn heading north on to Shaughnessy only has 1 left turn lane and backs up into Highway traffic every single work day between 3pm and 7pm. It usually backs up passed United Blvd and causes multiple accidents a year.

    Ideally this intersection needs to be replaced with an overpass and proper entrance and exit lanes on and off highway 7a and Shaughnessy.

    At the bare minimum we need some painted solid lines between lanes for the west bound traffic and a longer merging lane for drivers entering highway 7a westbound at this intersection. 2 lanes for the eastbound left turn lane and an extension to allow more cars would help with traffic and safety.

    Please let me know if this is the correct forum for this comment. Thanks.

    Reply
    • Thanks for your question Kris. We have sent it forward to our staff in the area for review and will let you know what we hear back.

      Reply
    • Hello Kris – here’s what we heard back.

      The ministry is currently undertaking a Mary Hill Bypass Corridor Study for the entire corridor between the Cape Horn Interchange and the Pitt River Bridge. The study is expected to be completed summer 2020. The study will focus on current restraints as well as for volume increases moving into both the near and longer term future. There are many stakeholder considerations being taken into account as the corridor is also a significant goods movement corridor with there being an industrial area as well as the CP Intermodal Yard in the area. Additionally, the ministry will need to consider other modes of transportation, such as cyclist and public transportation. All intersections along the corridor are at grade. We are not aware of any discussion to construct grade separated interchanges. Timelines for anything flowing from the findings of the study are unknown and there is no current plan in place for future construction activities. Regarding your comments around lane changes and request for a solid line – we shared your concern with our Traffic Engineering group and they advised that they will review the intersection to determine how long a line should be and where it should begin. We hope that this information is helpful. Thanks again for connecting with us here.

      Reply
  8. Hi There. Is the DriveBC site for Load Restrictions working? I have been trying for 2 days to checkout updates for the Cariboo Region and get an error message
    500-internal server error. There is a problem with the resource you are looking for, and it cannot be displayed

    I have tried to access on an iPad and Samsung tablet

    Thank you

    Reply
    • Good morning Leanna – thanks for your message. Friday and again Saturday there were technical issues with the Seasonal Strength Loss Program postings for restrictions. Subscribed email users were receiving empty emails, and those going to the site were encountering a “internal server error” message.

      We believe these issues are now resolved. We are investigating further as to root cause and our response to this issue. We apologize for any inconvenience this may have cause you.

      Reply
  9. Good (very early) morning TranBC,

    I just wanted to express my appreciation regarding the recent installation of emergency vehicle pre-emption signals (for people unfamiliar with them, they are the small rectangular signals with blue and white/clear lenses that are typically seen near the traffic signal heads themselves) at intersections along the Patricia Bay Highway. I was wondering if they would ever be installed given the location of Saanich Peninsula Hospital (plus the fact that the Beacon Avenue intersection has had them for a long time now), and I am glad that your contractors have gotten around to doing it! I presume (and hope) that these new signals will help save lives by reducing the likelihood of emergency vehicles having to wait or be endangered at intersections while responding to emergencies, which will be very important given the demographic trends of the Saanich Peninsula.

    Keep up the great work and I look forward to seeing what you plan to do next.

    Thank you and I hope you have a good Family Day!

    Regards,

    David Pedersen

    Reply